ANTSPACE HW5

$91,884.99 USD
$91,884.99 USD $97,799.00 USD
Sale Sold out 6% off
Shipping calculated at checkout.

Protected Purchase — Free 30-Day Returns

In stock

5+ Units
Get 10% off
10+ Units
Get 15% off
20+ Units
Get 20% Off

📦 Free worldwide shipping on all orders.

🔌 Power Supply (PSU) and all cables included

🛡️ 30-day buyer protection & free returns.

| Specifications

Product Overview Value
Model ANTSPACE HW5
Version V1
Dimensions (l*w*h), mm 12192×2438×2896
Miner capacity 210 units -S19 Hyd. &S21 Hyd. Series miner
Container certification China Classification Society Certification
Safety certification NFPA 79:2021
UL 508A:2018 R8.21
CSA C22.2 No. 14-18
ANSI/ISO 12100:2012
IEC 60204 Ed 5.1 2009
Operating power, kW 1062
PUE(Power usage effectiveness) 1.032
Input voltage and frequency 400V±5% 50/60Hz

 

 

Detailed Characteristics

Value
Shipping weight, T 14
Operating weight, T 24
Main switch of power distribution cabinets, A 1200*2
Rated current, A ≤986
Rated Current per Miner, A ≤10
Inlet cable The inlet cables can withstand high-voltage of above 600V, with the following requirements:
L1 single core cable 600kcMil(300mm²)x4
L2 single core cable 600kcMil(300mm²)x4
L3 single core cable 600kcMil(300mm²)x4
N Single-core cable 600kcMil(300mm²)x4
PE single-core cable 500kcMil(240mm²)x2
Flow rate, m³/h 85
Quantity of ANTSPACE powered by one 2500kVA Transformer 2
Dry-Wet Tower  
Heat Dissipation Capacity, kW 1200 kW
Outlet Temperature @ 28℃ Wet Bulb Temperature 35℃
Container Certification China Classification Society Certification
Operating Power, kW 15~29
Motor Rated Voltage and Frequency 400V±5% 50/60Hz
Motor Rated Voltage and Frequency DN40(Internal thread)
Drain Pipe Interface DN65(Internal thread)
Noise Level @25℃, 15m 70 dBA
Water Consumption, m³/h 0.7~1.3m³/h

| Points For Attention

1 The cooling tower must be placed on a flat ground with a level of ±1 degree.
2 The surface ground needs to be hardened and aimed to hold the ANTSPACE to be stable to withstand the load of at least 36 tons.
3 The customers need to prepare a 20-ton crane to load and unload ANTSPACE and Cooling-tower.
4 Stairs, walkway boards, transformers, cables, bridges, cable distribution boxes, and other external facilities are not included in ANTSPACE products.
5 If you plan to store ANTSPACE units vertically on top of one another, please advise the BITMAIN sales team regarding the preferred opening direction for the door facing the air inlet of your ANTSPACE unit. The door opens to the left by default.
6 Leave at least 2 meters of air inlet space around the cooling tower.
7 Operating elevation: lower than 2000 meters. If the height is more significant than 1000 meters and a 2500kVA transformer, the number of ANTSAPCE units installed in one ANTSPACE unit must be decreased by around 1%.
8 Environmental requirements: Temperature: -25°C~40°C; Humidity 10%RH~90%RH; The ambient temperature requirement in high-humidity areas is not higher than 40°C. When the ambient temperature is lower than 0°C, the inlet and outlet shutters need to be closed, and the interior of the mining machine can only be started when it is heated to above 20°C.
9 The ambient temperature of the ANTSPACE does not represent the ambient temperature of the mining machine.

We accept payments in cryptocurrencies such as Bitcoin, Ethereum, and USDT. For a complete list of payment options, visit our Payment Methods page.

Worldwide Delivery: We deliver globally through DHL and UPS.

Secure Delivery: Signature is required upon delivery for added security.

All orders are processed within 48-72 Hours after payment confirmation. We ensure efficient handling to get your equipment to you as quickly as possible.

View full details